Secret nailing the floor down to a wood subfloor.
Installing bamboo flooring on concrete.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
Yes depending on the style flooring you choose.
The two main installation methods over concrete.
Floating the floor using uniclic flooring.
Clean the floor well with a pressure washer if it is an older concrete floor to remove any sealers.
Bamboo wood floor can be installed in a number of different ways over different substrates.
The morning star or supreme bamboo tongue and groove floors and morning star click floors can be glued down to concrete on or above grade using adhesive.
We offer bamboo styles that can be nailed to wood subfloors glued down or floated over concrete.
There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
When you are done you will have a very solid durable floor to use for many years.
One of the types of sub floor that it can be installed over is concrete.
If you install bamboo flooring on a concrete subfloor you must check the concrete for moisture content first using a standard moisture meter.
This is particularly applicable if the concrete slab was laid within the previous 60 days as this is generally considered to be too freshly laid for a sufficient curing period prior to installation.
Floating the floor using tongue and groove flooring not parquet block 2.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
When you install bamboo flooring over concrete you will utilize a glue down method of installation.
Can i install bamboo on a concrete slab.
Bamboo flooring can be either glued down to concrete or screed or floated over an underlay.
Before you start to install your bamboo flooring you must ensure your sub floor is flat level dry and clean.
For both wood and concrete subfloors the radiant heat should be turned on for approximately one week to ensure excess moisture is removed.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
The glue down method can be used for solid or engineered bamboo flooring.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
Gluing the floor down to a concrete or wood.